Performed Application Integration Testing (AIT) of all the Third-party Application including Middleware testing, Front End UI testing and also validating the flow through GWCC to Third party applications which are mapped to GWCC.
Performed End to End System Testing on Services, Payments, Subrogation, Documents, Evaluations, Policy and Litigation Sections of GWCC during Stabilisation phase of Testing.
- End to End flow Knowledge of various third-party applications integrated to GWCC and UI flow for these applications.
- Extensively Worked on Services performed during the claim, Service Life Cycle, Vehicle Exposures, and Vehicle Damage and Loss. Also, have a keen knowledge of Vehicle damage evaluation process and worked with Third party integration in real time.
- Well Acquainted with STLC (Requirement analysis, Test strategy document preparation, Test Case design and execution) covered by Agile (SCRUM) testing methodologies and Monitored defects throughout its life cycle.
- Have done Ad Hoc, Smoke, Sanity and Regression whenever required on a continuous basis.
- Basic knowledge in HP-UFT and VBScript and designed few test scripts to automate FNOL in GWCC. Also Designed Macros to aid effective Test Design in MS Excel.