Made with
Standard Resume
Learn more

RAMASAMY RAMESH BABU

Planning Engineer
Singapore
|

ramesh.babu40@yahoo.co.in
|

+65 9640 7544
I am a Planning Engineer, knowing software are Primavera P6, Microsoft Project Planner, MS Word, MS Excel, MS Power Point. Bachelor of Civil Engineering (1995 - India), Diploma in Concrete Technology and Design of Concrete Structures (1992 - India), Diploma in Civil Engineering (1988 - India), 30 Years Experience (India – 19yrs & Singapore – 11yrs)
R
R

Work Experience

Tiong Seng Contractors (Pte) Ltd

Executive Engineer (Planning) Using Microsoft Project Planner
|

May 2012 - Current

1. Luxurie Condominium Project: Planning Engineer

2. Springside 3 Storey Terrace Dwelling House: Planning Engineer

3. Tuas South 2 Storey Single User Industrial Building: RTO (C&S)

4. Fan Yoong 9 Storey Single User General Industrial Factory with Ancillary Office: Planning Engineer

5. Tuas West Ave 7 Storey Single User Ramp - Up Industrial Development with Ancillary Office: Planning Engineer

  • 1. Preparation of Master Programme, Macro & Micro Programme, Working Programme, Two weeks look ahead programme with Drawing approval Status, 3 monthly rolling programme, Identity the Critical Path, Analysis on progress against manpower.
  • 2. Preparation of Daily, Weekly & Monthly Progress Reports, Tracking, Progress update, Monitoring, 4D progress update using Naviswork Manage.
  • 3. Preparation of Power Point Presentation for Planning & Progress for Consultant meeting, Stakeholders meeting etc.,
  • 4. Attend the Consultant Progress Meeting & All Kind of Meeting (Daily Progress Meeting, Sub-con Coordination meeting, Internal Progress Meeting etc.,)
  • 5. Assist to Senior Project Manager & Project Manager in terms of Programme, Monitoring, Progress, Contractual matters, EOT Claim, Material Management, Manpower Projection, S-Curve etc.,
  • 6. BCA ePSS Update

Yau Lee Construction (S) Pte Ltd.,

Senior Engineer (Planning & Project) Using Microsoft Project Planner
|

Oct 2010 - May 2012

Senior Engineer (Planning & Project)

One Block of 30-Storey Residential Flats Development (Total 56 units) with 2-Basement Car parks, Swimming Pool and communal facilities.

Proposed Public Housing Development Comprising1 Blk of 22-Storey & 2 Blks of 23-Storey Residential Building (Total 432 Units) with a Block of Multy-Storey Carpark, ESS, Supermarket Eating Establishment, Child Care Centre & Precinct Pavilion with Community Facilities.

  • 1. Preparation of Programme (Baseline Programme, Master Programme, Micro and Macro Programmes, Catch up Programme) for multi tasks
  • 2. Preparation of RFI
  • 3. Preparation of Method Statement
  • 4. Preparation Material Submission
  • 5. Attend the Technical meeting, Client meeting, Progress meeting, Consultant meeting
  • 6. All Kind of Temporary Works, All Kind of submissions and Carry Over the Structural Inspection

KTC Civil Engineering & Construction Pte Ltd.,

Senior Engineer (Structural Co-ordinator & Tendering)
|

Aug 2009 - Aug 2010

Marina Bay Sands-IR Project, Sky Park - RC Works

  • 1. Preparation of RC Shop Drawings (Especially Movement Joint at 56th &57th Level)
  • 2. Preparation of RFI, Preparation of Method Statement & RA, Preparation of PQP,
  • 3. Attend the Technical Meeting, Progress Meeting, Client Meeting, (Marina Bay Sands – IR), Consultant Meeting, Co-ordinate with Client, Consultant and Internal
  • 4. Preparation of Technical Query
  • 5. Preparation and closing the NCR Report
  • 6. Preparation of As Built Drawings, Preparation of Material Submission
  • 7. Using Aconex Management Software

M/S.WOH HUP PTE LTD. SINGAPORE.

Senior Site Engineer ( Structural & Planning)
|

Jun 2007 - Jul 2009

1. Reflection at Keppel Bay: Condominium Projects of 3Nos.41 Sty. & 3Nos.24 Sty. + 2 Lvl.of Basement Car Park. 11 Nos. Villa blocks.

2. Marina Bay Residences: Condominium Projects of 1 Block of 55 Sty. + 7 Sty of Car Park.

  • 1. Check and co-ordinate Structural, Archi. & M&E Drawings.
  • 2. Control & Monitor the Site Progress.
  • 3. Assist to Site Manager on the Production and labour control + over time + Resources.
  • 4. Conduct the regular meeting with production team & sub con. And Keep the all records.
  • 5. Attend the Technical & Progress Meetings.
  • 6. Preparation of Macro & Micro Programmes, Progress Report, S-Curve for Manpower

M/S.Amco India Constructions Pte Ltd. Chennai. ( South Korea Based MNC Company)

Senior Manager
|

Mar 2006 - Jun 2007

M/S.HYUNDAI MOTORS INDIA LTD. CHENNAI.

  • 1. Control & Monitoring the Progress in Structural, Architectural & Structural Steel works.
  • 2. Conduct the Regular meeting with Production Team of Engineers & Sub cons for all issues.
  • 3. BOQ Checking & Approval.
  • 4. Preparation of Macro & Micro Programmes & Progress report with Planning Engineer in times.

M/S.Reliance Engineering Associates, Madurai

Senior Engineer
|

Jun 2004 - Feb 2006

Retail Outlet, Telecomm Projects, and Building works.

  • 1. Execution and Site Control & Monitoring.
  • 2. Bill Checking & Etc., (for 2 Districts - 69 locations)

M/S.Greenpeace Constructions Pte Ltd. Chennai

Chief Engineer
|

Jan 2000 - Jun 2004

All Residential Apartments & Individual residential Building

  • 1. Execution and Monitoring the Residential Buildings.
  • 2. Preparation of Building Plan & BOQ.
  • 3. Co-ordinate with Structural Design Engineer.
  • 4. Bill Checking & Etc.,

M/S.Sabari Constructions Pte Ltd, Madurai.

Senior Engineer
|

Dec 1990 - Dec 1999

1. Residential Buildings.

2. Commercial Buildings.

3. Small Scale Industries Buildings.

4. Shopping Complex.

5. School Building.

6. Tower Line Construction 400,230,110KV – Survey & Tower Erection works.

7. Irrigation works.

  • 1. Preparation of Building Plan, BOQ.
  • 2. Approval submission to local authority.
  • 3. Execution and Controlling the site progress.
  • 4. Bill Preparation for Clients and Sub cons & Bill Checking & Etc.,

Tamil Nadu Electricity Board, (State Government of Tamil Nadu) Madurai.

Apprenticeship Trainee / Technician
|

Dec 1989 - Nov 1990

Tamil Nadu State Electricity Board (State Government) Projects

  • 1. Preparation of Quarters Plan, 230,110KV Control Room Plan, Switch Yard Plan, Tower Drawings.
  • 2. Office Administration works, Pay Bill Preparation, TA Bill Checking
  • 3. Assist to Assistant Engineer & Assistant Exe.Engineer in execution and other paper works

M/S.Thirumalai Construction Company, Madurai.

Site Engineer
|

May 1988 - Nov 1989

Residential Buildings.

  • 1. Preparation of Building Plan, BOQ. Execution.
  • 2. Preparation of client bill and sub cons bill.
  • 3. Bill checking & Etc.,

Education

Thiagarajar College of Engg. Madurai Kamaraj University

Bachelor of Civil Engineering
|

Aug 1992 - Nov 1995

Degree Certificate Awarded with First Class

Annamalai University, Chidambaram

Diploma in Concrete Technology & Design of Concrete Structures
|

Apr 1991 - Apr 1992

Diploma Certificate Awarded with Second Class

State Board of Technical Education, Chennai.

Diploma Civil Engineering
|

Aug 1985 - Apr 1988

Diploma Certificate Awarded with First Class

Projects

Reflections at Keppel Bay Project using Primavera P6 software

Senior Site Engineer (Structural & Planning)
|

Jun 2007 - Jul 2009

1. Check and co-ordinate Structural, Archi. & M&E Drawings.

2. Control & Monitor the Site Progress.

3. Assist to Site Manager on the Production and labour control + over time + Resources.

4. Conduct the regular meeting with production team & sub con. And Keep the all records.

5. Attend the Technical & Progress Meetings.

6. Preparation of Macro & Micro Programmes, Progress Report,

S-Curve for Manpower.

Marina Bay Residences

Senior Site Engineer (Structural & Planning)
|

Jun 2007 - Jul 2009

1. Check and co-ordinate Structural, Archi. & M&E Drawings.

2. Control & Monitor the Site Progress.

3. Assist to Site Manager on the Production and labour control + over time + Resources.

4. Conduct the regular meeting with production team & sub con. And Keep the all records.

5. Attend the Technical & Progress Meetings.

6. Preparation of Macro & Micro Programmes, Progress Report,

S-Curve for Manpower.

Marina Bay Sands-IR Project, Sky Park - RC Works

Senior Engineer (Structural Co-ordinator)
|

Aug 2009 - Aug 2010

1. Preparation of RC Shop Drawings (Especially Movement Joint at 56th &57th Level) 2. Preparation of RFI

3. Preparation of Method Statement & RA

4. Preparation of PQP

5. Attend the Technical Meeting

6. Attend the Progress Meeting

7. Attend the Client Meeting (Marina Bay Sands – IR)

8. Co-ordinate with Client, Consultant and Internal

9. Attend the Consultant Meeting with M/s.Aedas (Architect) and M/s.Arup (Structural)

10. Preparation of Technical Query

11. Preparation and closing the NCR Report

12. Preparation of As Built Drawings

13. Preparation of Material Submission

Hamilton Scotts: One Block of 30-Storey Residential Flats Development (Total 56 units) with 2-Basement Car parks, Swimming Pool and communal facilities

Senior Engineer (Planning & Project)
|

Oct 2010 - May 2012

1. Preparation of Programme (Baseline Programme, Master Programme, Micro and Macro Programmes, Catch up Programme) for multi tasks

1. 2. Preparation of RFI

2. 3. Preparation of Method Statement

3. 4. Preparation Material Submission

4. 5. Attend the Technical meeting

5. 6. Attend the Client meeting

6. 7. Attend the Progress meeting

8.Attend the Consultant meeting (M/s.Meinhardt, AMA Architect, P&T Consultants)

9. All Kind of Temporary Works

10. All Kind of submissions

11. Carry Over the Structural Inspection

HDB (N4C11): Public Housing Development Comprising1 Blk of 22-Storey & 2 Blks of 23-Storey Residential Building (Total 432 Units) with a Block of Multy-Storey Carpark, ESS, Supermarket Eating Establishment, Child Care Centre & Precinct Pavilion with Community Facilities on LOT 05711T PT MK 13 Sembawang Drive (Sembawang

Senior Engineer (Planning & Project
|

Oct 2010 - May 2012

1. Preparation of Programme (Baseline Programme, Master Programme, Micro and Macro Programmes, Catch up Programme) for multi tasks

1. 2. Preparation of RFI

2. 3. Preparation of Method Statement

3. 4. Preparation Material Submission

4. 5. Attend the Technical meeting

5. 6. Attend the Client meeting

6. 7. Attend the Progress meeting

8.Attend the Consultant meeting (M/s.Meinhardt, AMA Architect, P&T Consultants)

9. All Kind of Temporary Works

10. All Kind of submissions

11. Carry Over the Structural Inspection

Luxurie Condominium Project,

Executive Engineer (Planning)
|

May 2012 - Mar 2016

1. Preparation of Master Programme, Macro & Micro Programme, Working Programme, Two weeks look ahead programme with Drawing approval Status, 3 monthly rolling programme, Identity the Critical Path, Analysis on progress against manpower.

2. Preparation of Daily, Weekly & Monthly Progress Reports, Tracking, Progress update, Monitoring, 4D progress update using Naviswork Manage.

3. Preparation of Power Point Presentation for Planning & Progress for Consultant meeting, Stakeholders meeting etc.,

4. Attend the Consultant Progress Meeting & All Kind of Meeting (Daily Progress Meeting, Sub-con Coordination meeting, Internal Progress Meeting etc.,)

5. Assist to Senior Project Manager & Project Manager in terms of Programme, Monitoring, Progress, Contractual matters, EOT Claim, Material Management, Manpower Projection, S-Curve etc., BCA ePSS submission

Tuas South 11 - 2 Storey Singale User Industrial Building

RTO (C&S)
|

Mar 2016 - Aug 2016

All Structural Works Inspection and keep the record the inspection forms and progress report to Consultant. And BCA ePSS Submission

Tiong Seng Buildings, 9 Storey Singale User General Industrial Factory with Ancillary Office and Dormitory for 40 workers at 21, Fan Yoong

Executive Engineer (Planning)
|

Sep 2016 - Sep 2017

1. Preparation of Master Programme, Macro & Micro Programme, Working Programme, Two weeks look ahead programme with Drawing approval Status, 3 monthly rolling programme, Identity the Critical Path, Analysis on progress against manpower.

2. Preparation of Daily, Weekly & Monthly Progress Reports, Tracking, Progress update, Monitoring, 4D progress update using Naviswork Manage.

3. Preparation of Power Point Presentation for Planning & Progress for Consultant meeting, Stakeholders meeting etc.,

4. Attend the Consultant Progress Meeting & All Kind of Meeting (Daily Progress Meeting, Sub-con Coordination meeting, Internal Progress Meeting etc.,)

5. Assist to Senior Project Manager & Project Manager in terms of Programme, Monitoring, Progress, Contractual matters, EOT Claim, Material Management, Manpower Projection, S-Curve etc., BCA ePSS submission

Peck Tiong Choon Building: 7 Storey Single User Ramp-up Industrial with Ancillary Office at 39, Tuas West Ave

Executive Engineer (Planning)
|

Oct 2017 - Current

Assist to Senior Project Manager & Project Manager in terms of Programme, Monitoring, Progress, Contractual matters, EOT Claim, BCA ePSS submission

Skills

  • 1. Primavera P6, 2. Microsoft Project Planner, 3. MS Word, 4. MS Excel, 5. MS Power Point